Home > News > Industry News > Equipment improving for heat treated spring steel strip
NEWS & EVENTS
Equipment improving for heat treated spring steel strip

Equipment improving for heat treated spring steel strip

 

According spring steel surface heat bluing process test and analysis, transformation of existing equipment, quenching furnace, furnace entrance to increase the intake of ammonia decomposition, metering, security devices.

A pairs of technological transformation of existing bluing furnace, the furnace body length from 6250mm to 12900mm, oval tube to rectangular, increase in a central tube outlet, using energy-efficient structure, the furnace temperature uniformity halls, constant speed running. 
4.3 pairs of an existing production line to transform directly back to the stove after a long 8000 mm bluing furnace, forming a hardening furnace - furnace - bluing furnace continuous operations, improve production efficiency. Bluing furnace length is determined according to the quenching rate of different sizes to select the best temperature and blue with a good time. 


Conclusion 
After testing the research and production runs Recently, the air spring steel heat treatment to find out some regularity blue stuff in entertainment strip bluing main factors to determine the 370 ~ 420 ℃ of the most short-tailed bird blue temperatures and different the thickness of the strip bluing time, and when the trial can be repeated. For quenching and tempering continuous production line technological transformation, increasing the hardening furnace intake, measurement, safety devices and online bluing furnace, conducted through ammonia decomposition furnace gas and blue hair blue, uniform color, basically meet the standard and user requirements, greatly improve the surface quality blue and rust steel heat treatment capacity of our plant, and enhance competitiveness.

 

We try our best to improving our facility and equipment to meet all our client's requirement.